Sparta Kakorema
“Sparta Kakorema” wind farm, with 6,9 MW installed capacity and 6,6 MW maximum output capacity, is located in the Municipality of Thiva, Regional Entity of Viotia and consists of:
  • Two (2) Vestas V117 – 3,45 MW wind turbines
  • Control Building

Construction works were completed in August 2018 and the wind farm has been since operating, while the estimated yearly production amounts to 20 GWh.




Loupounaria
“Loupounaria” wind farm, with 6,9 MW installed capacity and 6,2 MW maximum output capacity, is located in the Municipality of Evrotas, Regional Entity of Lakonia and consists of:
  • Two (2) Vestas V126 – 3,45 MW wind turbines
  • Control Building

Construction works were completed in January 2019 and the wind farm has been since operating, while the estimated yearly production amounts to 17 GWh.